Economic impact of housing and development pipeline — 2024 to 2050
Total & local construction workforce required (FTE equivalent)
Total & local GVA from in-scope housing schemes (£)
Modelled units delivered per year from in-scope schemes
All 135 schemes in the pipeline
Key modelled outputs for the near-term delivery window
| Year | Units Delivered | Total Workforce | Local Workforce | Total GVA (£) | Local GVA (£) |
|---|
All projects from the source CSV are shown below. Filter or search to explore the full pipeline.
| ID | Development | Sector | Stage | Units | Location | Geocode address | Start | End | In Scope |
|---|
Annual workforce demand split across 10 construction occupations. All roles are modelled at equal intensity (10 workers per role per 1,000 homes delivered).
Each occupation (2024–2045 focus window)
Workers per occupation at peak demand year
Current role rates from the model (editable in the Occupation_intensity sheet)
Editable assumptions below recalculate the dashboard immediately. Import or export an assumptions.json file at any point.
Only editable inputs that the dashboard can recalculate from
| Group | Assumption | Value | Notes |
|---|
Used where timing is missing from the source data
| Stage | Default end year | Note |
|---|
Workers per occupation per 1,000 homes. These drive workforce totals and the occupation charts.
| Occupation | Rate | Units |
|---|
Scope, units and timing coverage from the current project set